Prior to Vent raise from 260 G.Eckersal (from Treve Lawrance) |
Taylor's shaft (near Morrisons Pool) TV engineer prepairs to lower camera & light down shaft. |
|
|
|
|
|
|
|
Prior to Vent raise from 260 G.Eckersal (from Treve Lawrance) |
Taylor's shaft (near Morrisons Pool) TV engineer prepairs to lower camera & light down shaft. |
|
|
|
|
|
|
|
Prior to Vent raise from 260 G.Eckersal (from Treve Lawrance) |
Taylor's shaft (near Morrisons Pool) TV engineer prepairs to lower camera & light down shaft. |
|
|
|
|
|
|
|
Prior to Vent raise from 260 G.Eckersal (from Treve Lawrance) |
Taylor's shaft (near Morrisons Pool) TV engineer prepairs to lower camera & light down shaft. |
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
|
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
|
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
|
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
|
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
|
|
|
|
|
|
|
|
Taylors shaft near Morrisons Pool (from Treve Lawrance) |
Lowering concrete blocks down the shaft after the blockage had been cleared. |
|
|
|
|
|
|
|
Tommy Adams (Left) & Geoff Sullivan. (from Peter Hughes) |
|
|
|
|
|
|
|
|
Robinsons (from Peter Hughes) |
Miners at Robinsons Shaft alighting the cage after their shift. |
|
|
|
|
|
|